MODEL NO. | Weight | Specification | Remark | ||
Width | Height (Thickness) | Length | |||
EP-1 | Common Park Side | 1,100 | 150(3.2) | 3,800 | Plain Deckplate |
EP-2 | Ramp Side | 1,100 | 150(3.2) | 3,800 | Hole Deckplate |
XP-1 | Ramp Side | 1,200 | 150(3.2) | 3,800 | EXPAND METAL(XG-13:NON SLIP TYPE) |
EP-3 | Common Park Side | 1,100 | 200(4.5) | 4,800 | Plain Deckplate |
EP-4 | Ramp Side | 1,100 | 200(4.5) | 4,800 | Hole Deckplate |
XP-2 | Ramp Side | 1,200 | 200(4.5) | 4,800 | EXPAND METAL(XG-13:NON SLIP TYPE) |
※ Welding of decks and various steel sections → Fabrication into composite panels → High-strength, low-profile panels treated with hot-dip galvanized coating
Classification | Content |
Durability | Semi-Permanent |
Lighting | Cannot expect |
Ventilation | Cannot expect |
Maintenance/Repair | Requires complex and excessive air supply |
Ecological Impact | Leads to serious issues |
Recyclability | Generates excessive industrial waste that cannot be recycled |
Post-Construction Stream Inspection | Inspections cannot be conducted without lighting equipment |
Construction Methods | Wet method requires excessive construction time |
Classification | Content |
Durability | Semi-permanent (galvanized steel plate treatment) |
Lighting | Excellent (more than 80% openness ratio) |
Ventilation | Excellent |
Maintenance/Repair | Possible to construct/repair in a short period of time. |
Ecological Impact | An environmentally friendly structure for preserving river ecosystems |
Recyclability | Easy to recycle and relocate |
Post-Construction Stream Inspection | Allows for constant monitoring of river conditions and easy sedimentation work |
Construction Methods | Shorter construction time with dry construction (steel frame) method |